Thanks to its location above the fog, the ground-mounted system will supply valuable winter electricity, especially in the cold months. In order to generate as much electricity as possible throughout the year, the modules, which are attached to steel cables, will be able to adjust their angle of inclination depending on the season. The mountain railroads in the Disentis ski area will be able to cover their entire annual electricity requirements. The existing infrastructure of the winter sports and hiking area allows an efficient connection to the electricity grid. Particular challenges in project planning are the proximity to the local ski slopes and the steep slope. These require sophisticated construction logistics.
Our services
- Overall management
- Site evaluation
- Feasibility study
- Environmental impact report
- Project planning