Implementation of the Winterthur General Drainage Plan

Basler & Hofmann is advising the city of Winterthur on the implementation of the general drainage plan and took on the project planning for connecting the municipalities in the Töss Valley and Kemptthal to the city's sewer system.

Basler & Hofmann supports and advises the Winterthur municipal drainage system on the implementation of the General Drainage Plan (GEP). In addition to consulting, the mandate includes updating the sewer system models of the actual and forecast condition as well as the hydraulic design and review of planned measures on the sewer system and special structures.

The wastewater treatment plants in Bauma and Mannenberg (Illnau-Effretikon) will be closed and the municipalities will be connected to Winterthur's drainage system. Basler & Hofmann planned the connections from Tösstal and Kemptthal to the Winterthur sewer system. Some of these connections are made through tunnels and on the surface in areas with challenging traffic conditions, which required particularly careful project planning involving various specialist disciplines.

Our services

  • Extract: Hydrodynamic sewer network calculations, long-term simulations and detailed hydraulics of special structures
  • Drainage concept and planning of measures
  • Hydraulics review and optimization of projects in the overall context of the sewer system
  • Project planning of connecting pipes to the Winterthur sewer system
  • Project planning of wastewater tunnels, project planning for deconstruction and conversion of existing wastewater treatment plant into stormwater tanks

Client

Winterthur Drainage Department, City of Illnau-Effretikon, Joint Establishment "Regionale Abwasserentsorgung Tösstal" GA RAT

Industry

Cities / Municipalities

Looking for a new professional challenge? Stay informed and subscribe to our job mail:

Subscribe to job mail