Schwamendingen enclosure: BSA
The enclosure of the A1 and A40 highways in Zurich-Schwamendingen drastically reduces noise and exhaust pollution in the district. The approximately 2-kilometer motorway section includes the existing Schöneichtunnel and the new enclosure. Basler & Hofmann was responsible for the planning and local site supervision for the operation and safety equipment.
The approximately 1.7 kilometer long enclosure will have a total of 4 technical centers, 3 of which will be newly built. The existing Schöneich control center will be converted during operation.
Our services
- Planning and site supervision for all operation and safety equipment systems
- Construction phase planning
- Coordination between BSA and construction as well as with third parties (mobile phone providers, City of Zurich, electricity companies, water supply, etc.).
- Migration and replacement concept as well as integration into the existing Infrastructure of the area unit
- Planning and implementation of partial commissioning and integral testing