Revision of the Zollikon general drainage plan
Basler & Hofmann has updated all sub-projects of the General Drainage Plan (GEP) of the municipality of Zollikon from 2006 in accordance with the current requirements of the model specifications of the Association of Swiss Wastewater and Water Protection Experts (VSA). As a basis, the system cadastre and the catchment areas were revised in accordance with the current specifications of the VSA-DSS data model. At the heart of the revision was the flyover of the list calculation into a hydrodynamic calculation with the Mike+ software for the actual and forecast state. This enabled a long-term hydraulic and material simulation, on the basis of which an impact-oriented planning of measures could be carried out.
Our services
- Development of the sub-projects data management, hazard prevention, extraneous water, water bodies, drainage concept and action plan
- Revision of sub-catchment areas according to the VSA-DSS model
- Hydrodynamic calculation and long-term material and hydraulic simulation
- Recording the data in the special structures database
- Coordination with the cadastral engineer