3. Tunnel Rosenberg tube: BSA

The Rosenberg Tunnel on the A1 in St. Gallen, which was built in 1987, needs to be extensively renovated in the 2030s. To make this possible, a 3rd tunnel tube must be built to accommodate traffic during the redevelopment. Basler & Hofmann is responsible for the Tunnel East as well as the operation and security equipment.

The operation and safety equipment will be designed to meet the current FEDRO specifications, whereby the equipment level for the section concerned is "high" with possible use of the emergency lane in the tunnel. The OSA equipment includes all specialist areas from energy supply, lighting and ventilation to signaling and monitoring systems.

Our services

  • General project and construction documents for the Tunnel East and the BSA operation and security equipment with all specialist departments
  • Phase-oriented BIM modeling of the tunnel, the combined service duct with escape route and the three electrical control centers

Client

Federal Roads Office FEDRO, Winterthur branch

Industry

Confederation / Cantons, Transportation

Looking for a new professional challenge? Stay informed and subscribe to our job mail:

Subscribe to job mail