Property protection for Sihlcity, Zurich

The Sihlcity leisure and shopping center is at risk from flooding of the Sihl. Following an initial risk assessment, comprehensive measures were taken to protect against a 300-year flood. However, the revised risk map then showed that these protective measures were no longer sufficient. The Sihl-Zürichsee relief tunnel will alleviate the situation from 2026. Optimization measures were examined for the interim phase.

The basic hazard data available in 2008 showed that the Sihlcity leisure and shopping center was at risk of flooding due to an outburst of the Sihl from a 100-year flood. The depression in the Giesshübelstrasse area was particularly at risk, as all basement levels could be flooded via the underground parking garage entrance located there. The aim of the project was to ensure flood protection for Sihlcity up to a 300-year flood event. Taking into account the flooding processes, measures were developed, analyzed and evaluated in terms of feasibility and costs. Finally, a comprehensive protection concept was implemented, which included numerous measures - from flood protection gates to flood protection doors, the sealing of pipe penetrations to mobile hose dams and insulating beams.

When the City of Zurich's risk map was revised, it became clear that the risk posed by the Sihl had been underestimated in the original survey. The protective measures implemented are currently not sufficient to protect against a 300-year flood. However, the Sihl-Zürichsee relief tunnel will go into operation in 2026, which will greatly reduce the flood risk. A review of the measures was therefore carried out in 2024 with the aim of optimizing the flood protection of Sihlcity both in its current state and in the state after commissioning of the relief tunnel.

Our services

  • Concept study with comparison of variants
  • Concept design and planning permission process
  • Advance construction documents
  • General contractor Invitation to tender, invitation to tender, site management
  • Emergency and alarm plan for the construction of mobile flood protection
  • Review of emergency planning based on the revision of the risk map and taking into account the future Sihl-Zurichsee 2026 relief tunnel
  • Investigation into the proportionality of adjustments to the protective measures for the interim situation until the commissioning of the relief tunnel

Client

Wincasa AG on behalf of the Sihlcity co-owners' association, Zurich