"Expansion step 2025": Unbundling Wankdorf South - Ostermundigen
SBB's "Expansion step 2025" (AS25) expansion program includes measures to increase capacity in the Bern area. This includes the "Wankdorf South - Ostermundigen separation" project, which centers on a separation structure that separates passenger traffic from freight traffic. Basler & Hofmann is responsible for overall management within the general planning consortium.
The project provides for a whole range of measures to improve the service on the line and make all railway stations disabled accessible: In addition to the inter-connection structure - a tunnel under the existing tracks - the project also includes adjustments to Wankdorf station, the expansion from three to five tracks, the replacement of the Bolligenstrasse bridge, a drainage tunnel, new construction of the Bernstrasse road bridge, extensive supporting structures and the complete conversion and expansion of Ostermundigen station.
Our services
- Overall management within the general planning consortium
- Sub-project management and project planning of engineering structures, civil engineering and special civil engineering including drainage and service pipes, bridge construction, route construction, railroad access with architecture, construction phase planning as well as logistics and land acquisition planning in the project planning, invitation to tender and implementation phases.
Involved expertise
General planner for infrastructure, Railroad construction, BIM infrastructure, Bridges, Geotechnics, Civil engineering structures, Tunnel constructionClient
Swiss Federal Railways SBBIndustry
Confederation / Cantons, TransportationDiscover similar projects