Ernst Schweizer: Industrial acoustics for production plants

We developed a customized acoustic concept to reduce noise pollution in Ernst Schweizer's production facilities in Hedingen. The aim was to protect the health and well-being of employees and meet noise protection requirements.

The company operates extensive production facilities for steel processing in Hedingen. The emissions from these facilities led to noise pollution for the company's employees. Our assignment included extensive noise measurements in the production halls in order to define the noise pollution, develop measures to reduce it and protect the well-being of the employees. The extremely high noise levels of some milling machines, which were able to spread unhindered due to the large expanse of the hall, posed a particular challenge.

Following precise noise measurements, we created an acoustic simulation to evaluate various shielding measures. The solutions developed were agreed with Suva and included special shielding and insulating materials that were installed specifically around noisy machines. The implementation of the measures led to a significant reduction in noise pollution in the production halls.

Our services

  • Surveying the industrial hall and carrying out acoustic measurements at all relevant noise sources in the operation
  • Creation of a 3D model of the hall
  • Carrying out an acoustic simulation to test the effectiveness of noise protection measures
  • Advice on the implementation of measures
  • Coordination with the authorities

Involved expertise

Acoustics

Client

Ernst Schweizer AG

Industry

Industry
Discover similar projects
By expertise
By industry

Looking for a new professional challenge? Stay informed and subscribe to our job mail:

Subscribe to job mail